Ship’s stability condition to be kept as close as to that when she is entering in the dry dock. |
Enough GM and positive stability during critical period. |
No changes of weight to be made without the consent of the dock-master. |
Movable weights to be secured. |
Minimum free surface effect and no list. |
All plugs to be secured. |
Anchors stowed and secured. |
All overboard discharges secured. |
Anodes fitted. |
All pipings, cable connections with shore disconnected. |
Start gyro, check heading. |
Inform E/R when flooding dock. |
Check for water tightness. |
Sound all tanks. |
Following times to be logged down: |
Flooding commenced |
|
Vessel floated |
|
Dock gate opened |
|
Vessel left dock. |
Check operation of all equipments. |
General cleaning and washing |
Normal sailing checklist. |
Check water tight integrity of the vessel. |